Smart lock factory in Wenzhou, China — samples, OEM and export documents in house.

mike@bbdhome.com WhatsApp +86 13968846265

Quality Control

Most smart lock claims are not about the design. They are about a batch that arrived with a fault nobody caught: a handle that drops, a board that drains the battery, a card missing from the box. These are the checks that stand between the line and your customer.

  1. Incoming material check

    Boards, readers, keypads, springs, bodies and battery contacts are checked against the confirmed specification before they enter the line.

  2. First article check

    For a new model or a new specification, the first assembled unit is reviewed against the drawing before the run continues, so a tooling or dimension error does not turn into a batch of rejects.

  3. In-process check

    Assembly stations check the unit before it is closed, which is the last moment a fault can be corrected cheaply.

  4. Function test

    Every unlock method, the keypad response, handle return, spring tension and latch movement are tested on the unit.

  5. Battery and cycle test

    Battery contacts, standby behaviour and repeated unlock cycles are checked, which is where the two most common after-sales complaints come from.

  6. Packing check and photos

    Contents, manual language and carton marking are checked against the approved proof, and packing photos are sent before dispatch.

  7. Third-party inspection

    SGS, BV or TUV inspection can be arranged at the factory before shipment if your process requires it.

Four Checks on Every Order

Four stages run on every order. Each one has a working instruction and a record, so a defect can be traced to the stage that produced it.

  1. Incoming material check

    Boards, readers, springs, shells and battery contacts are checked against the confirmed specification. A wrong component found here costs a supplier conversation; found after assembly it costs the batch.

  2. In-process check

    Dimensions and finish are measured while the batch is running, not only at the end. A body produced to the wrong size cannot be reworked.

  3. Final function check

    Every unit is opened once by its own entry methods: fingerprint, keypad, IC card and, on app models, from the phone. Battery contacts and the return spring are checked in the same pass.

  4. Packing check

    Contents, manual language, carton marking and quantity are checked against the approved packaging proof, and packing photos are taken before the carton is sealed.

What We Test and Measure

The tests we can run in house, and the ones we sample or send out. Anything not listed here is not claimed.

Swipe the table sideways to see the full specification →

Testing capability
MechanicalCycle testing of the handle, latch and return spring, plus a static load check on the panel.
ElectronicFingerprint read rate and keypad response after assembly, with the unit open and closed.
BatteryStandby current draw and a low-battery warning check, on the model's own battery type.
SealingIP65 / IP67 sample checks where the model claims a rating, confirmed per model.
CorrosionNeutral salt spray testing to ISO 9227 on plated and coated parts.
FitMortise, backset and door-thickness check against the confirmed drawing or template.

First Article Check and Batch Traceability

A first article check is not a marketing step. On a new model or a new specification the first assembled unit is measured against the drawing before the run continues, so a tooling or dimension error costs one unit instead of a batch.

Swipe the table sideways to see the full specification →

When it runsNew model, new specification, or a change to tooling or a supplier part
What is measuredDimensions, bore positions, panel alignment and finish against the drawing
Who signs it offThe production lead records the result before the run continues
Batch traceabilityBatch numbers are recorded, so a claim can be traced to a board batch, a spring lot or a packing shift

You Approve Before It Ships

Nothing ships on our word alone. You see the goods before the balance payment, and an independent inspector is welcome at the factory.

Swipe the table sideways to see the full specification →

Before dispatchFinished-batch photos and a working video sent to you
On requestThird-party inspection by SGS, BV or TUV, booked at the factory
On requestCustomer-nominated laboratory testing on samples from the production batch
After dispatchDocument set issued here so the shipment clears without a chase
If something is wrongA written root-cause answer, then replacement parts, a credit or a swap in the next shipment, traced through the batch number

Buyer Questions

Buyer questions

Can we define our own inspection plan?

Yes. Send the checkpoints and the acceptance criteria you want and we will confirm whether they can be applied at the factory, and at which stage.

Can we see the goods before they ship?

Yes. Packing photos are sent before dispatch on every order, and third-party inspection can be arranged so your inspector sees the batch at the factory.

Can a defect be traced back to a batch?

Yes. Batch numbers are recorded, and a claim is handled as an investigation that identifies the cause at the level of board batch, spring, assembly or packing.

What does the first article check actually do?

For a new model or a new specification the first assembled unit is reviewed against the drawing before the run continues, so a tooling or dimension error does not become a batch of rejects.

What happens when a batch is faulty?

A written root-cause answer, then replacement parts, a credit or a swap in the next shipment, with photos or video as evidence. Spare parts are added to a later order so the site is not left short.

Do you offer a warranty?

12 months on electronic parts. The exact scope, the consumable parts list and the replacement process are confirmed on the order documents.

Next Step

If the answer you need is not here, ask us directly. We would rather answer a hard question before the order than after the goods land.