Hotel Card Lock
HR12 Hotel Card Lock
- Unlock
- RFID card, keypad, mechanical key
- App
- Hotel management software
- MOQ
- 30 sets
A hotel lock is part of a system. The lock, the encoder, the software and the spare cards have to arrive together and match the doors on site, or the floor cannot open on the agreed date. We quote the package against the door schedule rather than selling a lock on its own.
Who this is for: Hotel and serviced apartment projects, resort operators, integrators and security contractors.
Swipe the table sideways to see the full specification →
| Typical buyers | Hotel and serviced apartment projects, resort operators, integrators and security contractors |
|---|---|
| Entry methods | Fingerprint, keypad, IC card, app or a combination |
| App options | Tuya or TTLock, with gateway for remote control |
| MOQ | 30 sets (door locks) / 1 carton (20 pcs) (padlocks) |
| Samples | 3-7 days |
| Trial order | 10-15 days |
| Bulk order | 20-35 days |
Four decisions decide whether this installation works. We settle them before production instead of after delivery.
Door type, thickness, fire rating and finish decide the lock body and the fixing method.
Card locks, encoder, management software and a spare card quantity are quoted as one order.
Card quantity is planned so the property holds spares from day one.
Goods are staged to match the installation sequence where the site needs it.
These are the models buyers most often take for this scenario. Each page lists the unlock combinations, the fit information and the commercial terms.
Hotel Card Lock
Smart Mortise Door Lock
Smart Mortise Door Lock
Each item on the left has caught an order out before. They are cheap to answer at quote stage and expensive to correct once the goods have shipped, so we settle them in writing before production.
Short answers with the conditions attached, so you can tell whether each one applies to your project.
Buyer questions
Yes. Card locks are quoted with the encoder and the room management software so the property can open on schedule.
Yes. A replacement card quantity can be added to a later shipment so the property is never short.
Confirm the hierarchy you need, such as floor masters and one grand master, and we configure the order accordingly.
Production is staged against the installation sequence so the site is not holding a whole project in storage.
Send the site details, the quantity and the market. We reply within 12 working hours with the model, the app version, the MOQ and the lead time.