How to Place a First Smart Lock Order Without Wasting a Quarter
The sequence that turns a first order into a repeat programme.
Read the article →Compliance questions usually arrive as one line in a tender: provide the certificates. The honest answer is that certificates are specific to a product, a model and a market, and the useful conversation is about which of those three the project actually needs.
Swipe the table sideways to see the full specification →
| Electrical safety | The standard the destination market applies |
|---|---|
| Electromagnetic compatibility | Emissions and immunity, market specific |
| Radio equipment | Where the lock has Bluetooth or Wi-Fi |
| Restricted substances | RoHS and REACH, or the local equivalent |
| Battery transport | Where the goods contain a lithium battery |
A CE mark answers a European question. It does not answer a North American one, and it is not a building-code approval anywhere. Projects that conflate the two usually discover it at the import or inspection stage.
Swipe the table sideways to see the full specification →
| Certificates | Issued for the model you order, naming that model |
|---|---|
| Test reports | Releasable for your own market filing, on request |
| Declaration of conformity | Against the standard the model was tested to |
| Material declarations | RoHS and REACH statements for the parts concerned |
| Battery documents | The declaration and packing documents for the shipment |
Where a project needs something we hold for a different model, the answer is usually a test rather than a document. That is a schedule item, so it needs to be raised at tender stage rather than at shipping.
Swipe the table sideways to see the full specification →
| Format | Searchable PDF, one file per certificate or report |
|---|---|
| Naming | Model number and document type in the filename |
| Scope note | A line stating which models the document covers |
| Cover sheet | A list of what is in the pack, so nothing is assumed present |
Ask for the certificate numbers and the models they cover rather than a list of standards. A list of standards does not tell you which model was tested.
Three questions this guide usually raises.
On this topic
No. CE answers a European question and is not a building-code approval anywhere. Tell us the destination market and we will say which documents apply.
Yes, releasable on request against the model you order. Say at tender stage if your market filing needs them, because a new test is a schedule item.
Then the answer is usually a test rather than a document. Raise it before the order rather than at shipping.
The sequence that turns a first order into a repeat programme.
Read the article →Five photos and three numbers are usually enough to confirm the fit.
Read the article →The packaging is the part buyers underestimate, and the part that cannot be changed once it is printed.
Read the article →