How to Place a First Smart Lock Order Without Wasting a Quarter
The sequence that turns a first order into a repeat programme.
Read the article →Most supplier evaluations fail because they ask about price first and capability never. These nine questions are ordered so that each answer makes the next one easier to judge, and every one of them has a checkable answer.
Ask for the actual records, not a description of the process. A factory that runs incoming checks has sheets with dates, batch numbers and the values measured.
Swipe the table sideways to see the full specification →
| What to ask for | Incoming inspection sheets and in-process check records |
|---|---|
| Good answer | Dated records with batch numbers and measured values |
| Weak answer | A description of the process with no records attached |
| Why it matters | Records are the only way a defect can be traced later |
The first assembled unit of a new specification should be measured against the confirmed drawing before the run continues. Ask what happens if it fails.
Most disputes are version disputes. Ask how the firmware, the app version and the hardware revision are recorded, and where you can see them.
Swipe the table sideways to see the full specification →
| Recorded at quote | Firmware, app version, hardware revision on the quotation |
|---|---|
| Recorded on the sample | The same three, on the sample you keep |
| Recorded at production | Batch number tied to the confirmed specification |
| Changed later | Only with written approval against the approved sample |
Website MOQ is usually the smallest order the line will take, not the smallest order you can place. Ask what the real minimum is for the specification you want, including the packaging.
Packaging is often the hidden threshold: a printed colour box has a print run minimum that is higher than the product minimum.
| EXW | Buyer collects at the factory | Lowest unit price, most buyer work |
|---|---|---|
| FOB | Seller to the ship | The most common basis for buyers with a forwarder |
| CIF | Seller to the destination port | Includes freight and insurance |
| DDP | Seller to the buyer's address | Includes clearance and duties |
Compare quotations on the same term. A low EXW price and a high DDP price may be the same number once freight and duty are added.
The answer should describe a sequence, not a promise. Ask what evidence is needed and what the remedies are.
Almost nobody makes everything. What matters is whether the supplier knows the difference, and whether the bought-in parts are inspected on arrival.
Swipe the table sideways to see the full specification →
| Made in house | Bodies, panels, assembly, testing, packing |
|---|---|
| Bought in | Boards, sensors, batteries, springs, packaging |
| The question that matters | Which of those are inspected on arrival, and how |
Yes is the only useful answer, and the follow-up is whether the sample cost is refundable against the bulk order. Samples ship in 3-7 days from a confirmed specification.
Ask for the certificate numbers and the model they cover, not for a list of standards the company holds in general.
A management-system certificate such as ISO 9001 says how the factory is run. It is not a product approval, and a supplier who blurs the two has not answered the question.
Three questions this guide usually raises.
On this topic
Ask which parts are made in house and ask to see the in-process records. A trading company can describe a process but cannot produce dated inspection sheets.
A live video walkthrough answers most of it, and third-party inspection by SGS, BV or TUV can be booked at the factory before shipment.
Only against the same specification and the same trade term. Compare line items rather than totals, because material, body, app version and packaging all move the number.
The sequence that turns a first order into a repeat programme.
Read the article →Five photos and three numbers are usually enough to confirm the fit.
Read the article →The packaging is the part buyers underestimate, and the part that cannot be changed once it is printed.
Read the article →