How to Place a First Smart Lock Order Without Wasting a Quarter
The sequence that turns a first order into a repeat programme.
Read the article →Hospitality projects fail on timing more often than on product. The property cannot open until the locks, the cards, the encoder and the software are all on site and working together, which makes the delivery sequence the critical path.
Hotel doors are usually thicker and heavier than residential doors, and the mortise and the fixing have to suit what is actually hanging.
Swipe the table sideways to see the full specification →
| Locks | Room doors, plus back-of-house where required |
|---|---|
| Cards | Guest cards, staff cards and a front-desk working stock |
| Encoder | The device the front desk uses to write a card |
| Software | Issues cards, tracks rooms, produces the audit trail |
| Gateway | Where the property wants live status or central control |
Software and locks arriving separately is the most common cause of a property that cannot check guests in. They ship as one package.
Swipe the table sideways to see the full specification →
| Guest card | One room, valid for the stay |
|---|---|
| Section master | The rooms one supervisor is responsible for |
| General master | All rooms, held by management |
| Override | For a lockout or an incident, with an audit entry |
Order spares with the locks. A card re-order carries its own lead time and shipping cost, and a card shortage stops check-in, which is an expensive way to save a small amount.
Work backwards from the opening date, including the fit-out and the commissioning time. Then phase delivery by floor or wing so nothing sits in a corridor.
Tell us the opening date at quote stage. We will say plainly whether the programme holds rather than promising a date and missing it.
Three questions this guide usually raises.
On this topic
They are supplied as one package with the locks, so the property is not integrating three vendors before it can open.
Yes, arranged at quote stage so the fit-out sequence, the freight and the documents all match.
Tell us the rating required. The lock and its fixing have to suit it, and we will confirm what we can supply rather than assume.
The sequence that turns a first order into a repeat programme.
Read the article →Five photos and three numbers are usually enough to confirm the fit.
Read the article →The packaging is the part buyers underestimate, and the part that cannot be changed once it is printed.
Read the article →