Read the article →On a project the lock is one line in a larger package, and the thing that breaks it is rarely the lock. It is a dimension nobody checked until the doors were hung, or a delivery that arrived before the site could store it.
The schedule carries door type, thickness, handing and the existing preparation. That is the document we work from, and each line is confirmed rather than the project as a whole.
Swipe the table sideways to see the full specification →
| Door type | Each type is confirmed separately, even inside one project |
|---|---|
| Thickness | Measured in millimetres, not assumed from the door type |
| Handing | Left or right, read from the hinge side |
| Existing preparation | The hole that already exists constrains the body |
Six mortise body sizes cover most of what we ship: 5050, 5845, 6860, 7255, 8545 and 8560, plus lock-only supply where you already hold body stock. Where a schedule calls for something outside those, it is engineered from your drawing.
A site that cannot store a container should not receive one. Delivery is phased against the programme, arranged at quote stage, with the documents matching each phase actually delivered.
Non-standard mortise lengths, unusual backsets and stainless bodies are normal orders. The process is a drawing review, a sample with a cut-out template, and then production, so the run is not the test.
Keyed-alike and master-key plans are applied during assembly rather than afterwards, which avoids a re-keying step on site. The key plan is a project document, so it needs to exist before production rather than after.
Swipe the table sideways to see the full specification →
| Keyed alike | One key opens a defined group of units |
|---|---|
| Master key | One key opens everything in the group |
| Set at production | Applied during assembly, avoiding site re-keying |
| What we need | The key plan, by door or by room, with the group definitions |
Confirm the four dimensions at tender stage rather than after the doors are ordered. A specification that arrives late becomes a variation, and variations cost more than measurements.
Three questions this guide usually raises.
On this topic
Yes. Send the schedule and each door type is matched line by line, then confirmed in writing before production.
Yes, phased against your instruction, arranged at quote stage so the freight and the documents match the phases delivered.
Yes. The key plan belongs on the drawing, because it is a project decision rather than a product option, and it is applied at production.
The sequence that turns a first order into a repeat programme.
Read the article →Five photos and three numbers are usually enough to confirm the fit.
Read the article →The packaging is the part buyers underestimate, and the part that cannot be changed once it is printed.
Read the article →