The door schedule comes before the order
Room doors, back-of-house doors and meeting rooms have different requirements. Confirm the schedule first and the lock choice becomes obvious.
Buyer guide · Hotel and serviced apartments
A hotel lock is a system, not a product. Locks, cards, the encoder and the software have to arrive together, or the property opens with a manual key.
Swipe the table sideways to see the full specification →
| Buyer type | Hotel and serviced apartments |
|---|---|
| Typical first order | 30 sets door locks / 1 carton (20 pcs) padlocks |
| Samples | 3-7 days |
| Trial order | 10-15 days |
| Bulk order | 20-35 days |
| Customisation | Marking, packaging and non-standard bodies at quote stage |
| What to send first | Door photo or drawing, quantity, destination market |
Two things worth knowing before the first order, whichever product you end up buying.
Room doors, back-of-house doors and meeting rooms have different requirements. Confirm the schedule first and the lock choice becomes obvious.
Spare cards and the front-desk workflow are part of the delivery, not an afterthought. A property that runs out of cards is a property that cannot check guests in.
The five that come up most often in this buyer group, answered with the conditions attached.
Buyer questions
The lock, encoder and software are supplied as a package so the property is not left integrating three vendors. For third-party PMS integration, tell us which system and we will say what is possible.
Order spares with the locks rather than afterwards, because a card re-order carries its own lead time. The quantity depends on turnover and how often guests lose cards.
Yes. Master-key and floor-level access plans are arranged from the key schedule, which is a project document rather than a product option.
Tell us the rating required. Where a door has a fire rating, the lock and its fixing have to suit it, and we will confirm what we can and cannot supply.
Yes. Phased delivery is arranged at quote stage so the fit-out sequence and the freight match.
Each of these has cost somebody a shipment. All four are avoidable at quote stage.
Hotel doors are often thicker and heavier than residential doors. The mortise and the fixing have to suit what is actually hanging.
A card shortage stops check-in. Spares are cheap compared with the alternative.
The property cannot open until the software, the encoder and the locks are all on site, ideally in one shipment.
Work backwards from the opening date, including the fit-out and commissioning time, not forwards from the order date.
Four stages, and what we need from you at each one.
Room type, thickness, handing and fire rating, line by line.
Locks, encoder, software and spare cards specified together as one delivery.
Matched to the fit-out sequence so nothing sits in a corridor.
One room fitted and checked before the batch is produced.
Chosen for this buyer group rather than sorted by date.
Why hotel doors need their own check.
Read the guide →The photograph that answers the fit question.
Read the guide →What the housekeeping team needs to know.
Read the guide →Which platform fits a property workflow.
Read the guide →How a property-scale order was defended.
Read the guide →What to send with the room list.
Read the guide →