You have a door schedule and a completion date. The lock is one line in a much larger package, and the thing that breaks a project is a dimension nobody checked until the doors were hung.

Swipe the table sideways to see the full specification →

At a glance
Buyer typeProject contractors
Typical first order30 sets door locks / 1 carton (20 pcs) padlocks
Samples3-7 days
Trial order10-15 days
Bulk order20-35 days
CustomisationMarking, packaging and non-standard bodies at quote stage
What to send firstDoor photo or drawing, quantity, destination market

Who This Page Is For

Two things worth knowing before the first order, whichever product you end up buying.

A project is read from the door schedule, not the catalogue

The schedule carries door type, thickness, handing and the existing prep. That is the document we work from, not a product photograph.

Four dimensions decide whether it fits

Door thickness, mortise body, backset and handing. Confirm those four and the rest of the specification follows.

Five Questions Project contractors Ask

The five that come up most often in this buyer group, answered with the conditions attached.

Buyer questions

Can you supply bodies to match our door schedule?

Yes. Send the schedule and we match the mortise, backset, door thickness and handing line by line, then confirm it in writing before production.

Can delivery follow the construction programme?

Where the site takes goods in phases, we ship in phases against your instruction rather than sending one container to a site that cannot store it.

What if the project needs a non-standard body?

Non-standard mortise lengths, panel sizes and stainless versions are engineered from your drawing and sampled before the run. It is a normal order, not a special case.

Can you part-ship across phases?

Yes. Part-shipping is arranged at quote stage so the freight and the documents match the phases actually delivered.

Do you support master-key systems?

Keyed alike and master-key systems are available. The key plan belongs on the drawing, because it is a project decision rather than a product option.

Four Mistakes We See Most

Each of these has cost somebody a shipment. All four are avoidable at quote stage.

Mounting holes that do not line up

The body has to fit the hole that already exists. Where the doors are not yet prepped, the template has to reach the joiner before drilling.

Specification confirmed too late

A specification that arrives after the doors are ordered becomes a variation. It costs less to confirm the four dimensions at tender stage.

Retail packaging on a site

A construction site needs cartons that survive handling and a packing list that matches the phases, not shelf-ready boxes.

Assuming a certificate is enough

A CE document is not a building-code approval. Tell us the standard the project requires and we will say plainly whether we can meet it.

How We Work With You

Four stages, and what we need from you at each one.

  1. Start from the door schedule

    Send it with the project quantity and the phase dates. We confirm fit per door type.

  2. Sample before the bulk run

    A pre-production sample with a cut-out template lets the installer check the opening before drilling.

  3. Deliver against the programme

    Phased shipments arranged at quote stage, with documents matching each phase.

  4. Non-standard first, then repeat

    A new body gets a drawing and a sample round before production so the run is not the test.